Rasuwa- Import of goods has begun from the Rasuwagadhi trade transit point with the Rasuwagadhi-Kerung Highway coming into operation.
The import has started with the resumption of the highway after its maintenance. Vehicular movement was completely disrupted along the highway after It was blocked due to recent heavy rains and floods.
According…