NEA says power cut to industrial zone to continue until Upper Tamakoshi re-operated

blog

NepShoot Image

Kathmandu, Dec 17: Nepal Electricity Authority (NEA) has said the industrial customers would have to bear with power cuts in the evening time until the re-operation of the Upper Tamakoshi Hydropower Project which was damaged by flooding and landslide on September 27 and 28.     

NEA Managing Director Kul Man Ghising said it has been…



Source link

Share this news on

समाचारको श्रोतहरु